home > Government affairs > News and Events
The Construction of the Yangtze River Fifth Bridge Jiangbei Section Has Been Stepped Up
2019-08-06


On August 5th, in the Lvshuiwan Wetland Park in Binjiang River Scenic Zone of Jiangbei New Area, a “Dragon” crossed.

As the main bridge tower of the Yangtze River Fifth Bridge is capped, rows of piers extend from the river surface to the wetland park and the bridge deck installation is being stepped up. It is expected that the main bridge will be connected in April 2020 and will be opened to traffic at the end of 2020.

At that time, it will take less than 10 minutes to reach Jiangbei from Jiangshan street in Hexi through the Yangtze River Fifth Bridge channel, which is 11-kilometer long and has dual six-lane carriageway.

 

Source: Nanjing Daily

Copyright 2009 Nanjing China All Rights Reserved 2013 Total visits:
www.nanjing.gov.cn